Bridge Design

Fall '15 I worked with three other Thayer students (Ralf Carestia, Nadav Hendel, and Keenan Wood) to design and build a 6 inch long cantilevered bridge, and to accurately predict the load and point of failure at an astounding 400 pounds.

solidworks prediction images:

Screen Shot 2016-03-29 at 11.04.22 AM Screen Shot 2016-03-29 at 11.04.50 AM Screen Shot 2016-03-29 at 11.04.22 AM

our constructed bridge & testing apparatus:IMG_0179IMG_0176 IMG_0177

Leave a Reply